References
Domestic expertise at an international level
For the 2021–2025 period, Vietnam is ranked among the world's 10 most dynamically developing data center markets, which, alongside its incredibly fast-paced digitalization, also means large-scale infrastructure development. H1 Systems contributed to the region's development through a project of outstanding prestige even by international standards, by designing the data center handed over at the end of 2022. The client, VNG Corporation, is Vietnam's leading IT service provider, holds a significant market share in the fintech, gaming and cloud business areas, and employs around 5,000 people.
The latest infrastructure investment of the company, founded in 2004, is an Uptime TIER III certified server center with 12,000 m² of usable floor area, capable of accommodating up to 1,600 racks. Our team not only prepared the design documentation, but also supported the construction throughout the process and took part in carrying out the certification, which was an enormous help to the client. Thanks to the well-considered concept and design, the measured PUE value of the data center operating in a subtropical climate was below 1.33 during the Uptime TCCF tests, which is far better than the average PUE of around 1.7 of data centers running in the more temperature-favorable Hungarian, continental climate.
As part of the comprehensive reconstruction of Magyar Nemzeti Bank's properties, the Bank decided to refurbish the machine rooms located within the buildings. It set the goal of ensuring that these machine rooms also provide future-proof infrastructure support of appropriate quality for their operation. In designing the machine rooms, it was stipulated that they comply with the Uptime TIER III category in terms of topology, structure and energy balance.
While this was not yet the case for the Buda Palota, for the later Szabadság tér construction the certification of the machine room's designs and construction by Uptime specialists was already a requirement. In addition to concept creation and the preparation of the construction drawings, our expert colleagues provided professional support during the construction, ensuring the Uptime TIER III compliance of the shop and as-built drawings, and also carried out the on-site expert tasks during the construction. Our design colleagues likewise managed the quality assurance processes throughout the entire certification process of the SZ9 data center, which obtained the Uptime TIER III certification ensuring high availability and uninterrupted operation both for the designs (TCDD) and for the completed infrastructure (TCCF).
On behalf of OTP Bank, we participated as an external expert in the development of the Bank's long-term strategy. In this multi-year program, the current data center and server room infrastructure was surveyed, their reconstruction needs were mapped out, and the Bank's long-term data center vision was also defined.
Careful design work led to the creation of the two final sites realized in the vision. On the one hand, construction-level design documentation had to be produced for the sites to be developed; on the other hand, taking into account the time required for construction, a schedule had to be built and executed that also allows the IT equipment serving the banking core systems and enterprise applications to be relocated from one site to the other, while ensuring continuous live operation. In the case of the 1.3 MW total capacity greenfield data center investment, the developed facility was divided into several server room spaces in a scalable manner. The complete technology system construction of both the reconstruction and the greenfield investment was carried out by H1 Systems.
The server room realized for MTVA was created as part of a critical infrastructure that also supports the operation of the National Air and Disaster Alert System (OLGI) installed on the broadcasting network. During the project, a high-availability data center environment designed according to the Uptime approach was implemented, capable of meeting the strict operational safety requirements arising from continuous operation.
The construction was carried out along comprehensive engineering integration: from the architectural design through the building services systems, the high-voltage power supply and lightning protection, all the way to the low-voltage and security technology systems, every element was developed along a unified concept. The fire detection and extinguishing systems likewise ensure the protection of the facility as part of this integrated architecture. During the investment, which began at the end of 2022 and was realized within a year, we also paid special attention to energy efficiency. The data center was built with a cold-hot aisle layout, which optimizes the operation of the cooling systems and contributes to economical operation.
Within the framework of the European Union's Horizon 2020 innovation framework program, H1 Systems, as the leader of an international consortium, carried out a research and development program with a total value of 3 M euros. The consortium participants were the Swedish royal research institute (RISE), the German Fraunhofer, and the British Ecocooling. The deliverable of the project is the BTDC ONE data center model, built in Boden, Sweden in 2019, which has for many years been the world's most energy-efficient data center with the lowest annual average PUE (1.02).
The data center type, using holistic cooling technology, sustainable materials, and 100% green energy, was also commercially utilized in multiple ways; in the first years, high-performance servers performing VFX post-production tasks operated here, and later it came into the ownership of HIVE, a company specializing in bitcoin mining. The success of the BTDC ONE data center was recognized with the DCD Global Award. H1 Systems' engineering team still works together on numerous tasks with RISE's research team in Luleå dealing with data center cooling technology and energy efficiency; in the HEATWISE project closing at the end of 2026, we are developing technical prototypes for the efficient and useful utilization of data center waste heat, in the interest of energy-efficient operation and sustainability.
As a brownfield investment, we designed and built Hungary's first TIER III data center for Invitech, which, uniquely in our country, holds an Uptime TIER III certification covering the operating facility in addition to the design documentation. A multi-version data center development concept was prepared, in which we elaborated the technical and economic aspects in detail.
We achieved the desired result with a house-in-a-house system, which was necessary in order to provide adequate water protection. As a point of interest, the first Vertiv Econophase units in the world were installed here for the first time. The operational tasks have been carried out by H1 Systems ever since, and we also perform various electrical installations on-site for the tenants.
CERN commissioned our company to build a data center that, through its state-of-the-art supporting infrastructure, supports the dynamically changing needs of research and innovation with exceptional energy efficiency and in an environmentally friendly way. Within the framework of an international tender announced among CERN's 22 member states, Hungary successfully bid to build the 2,000 m² data center with four machine rooms.
According to industry best practice, building such a unit takes roughly a year and a half, but here two machine rooms had to be operational after seven months, and while maintaining continuous operation, the rest had to be commissioned half a year later. Working together with the Wigner Research Centre for Physics, H1 Systems prepared innovative technical construction designs and, during the general construction, offered solutions that met the high-level expectations envisioned by the Research Centre and CERN's objective. Accordingly, for the first time in Europe, a redundant, long-distance network connection with a bandwidth of 100 gigabits per second was realized, directly linking the accelerator facility in Geneva and the Wigner data center in Budapest.
Our company won the construction task of the data center forming part of the development center built within the framework of the investment. During the construction, H1 Systems realized the construction of a 230 m² server room with 550 kW capacity, 2N redundancy level, located in the office building and capable of accommodating 60 racks.
As an unconventional solution, the machine room infrastructure was designed within the office building in such a way that the cooling energy is partly available from the building's heating center, which is served by heat pump systems. For this, a liquid cooling system providing redundancy was also developed, with the primary function of guaranteeing operational safety under all circumstances. During the design of the system, the goal was to ensure that the cooling energy is supplied primarily by the highly energy-efficient heat pump systems.
During the development of Raiffeisen Bank's new computer center, we participated in the realization of a complex engineering task integrating several disciplines, which extended from the initial concept creation all the way to operation. As the first step of the project, a preliminary concept based on risk analysis was prepared, which defined the technical and operational foundations of the facility, as well as the framework for an infrastructure that is secure and scalable over the long term.
During the design and development of the 200 m² Lampertz technology computer room, the entire infrastructure was approached as a unified system. The building services systems – including air conditioning and fresh air supply – fit closely with the high-voltage power distribution network, as well as with the emergency and uninterruptible power supply solutions. The project did not end with the construction: the maintenance and operation of the installed systems is also carried out by our team.
In addition to its project-based services, H1 Systems provides technology operations services based on the Uptime Institute Management & Operations (M&O) methodology, delivered with high availability for the largest digital infrastructure owners and providers in Hungary. Our operations practice is further strengthened by professionals holding the Uptime AOS (Accredited Operations Specialist) qualification. Our clients include organizations with critical infrastructure, such as NISZ, Magyar Telekom, CETIN (which operates Yettel's regional network), as well as Invitech, a member of the ONE group. For HUN-REN, we oversee the mechanical equipment of the Wigner data center we built in Csillebérc, and we carry out the regular inspection and maintenance of numerous additional server rooms and data centers for industrial companies, media firms, financial service providers and other market players.
The Zenit project is a complex development of approximately 7 hectares, also including office, residential and service buildings, in the capital's Zugló district. H1 Systems' task was the complete construction of the low-voltage systems of 4 office buildings, which was full of challenges due to the tight schedule and the differing tenant requirements for each building.
During the preparation of the project, we also coordinated the work of several design teams, supplemented by the design of a central, customized dispatch center for the entire building complex. The integration and proper commissioning of the systems adapted to the individual tenant requirements also required extensive internal cooperation from our various specialist teams.
During the building reconstruction carried out at a prominent location, in a heritage-protected environment, we performed comprehensive design and build system integration that encompassed almost the entire spectrum of the design and construction of low-voltage systems. In addition to building out the security technology and IT infrastructure, our tasks also included fire detection, access control and intrusion detection, a camera system, and the development of several custom security solutions.
The period-faithful interior design tested both our designers and our colleagues managing the construction; numerous hidden solutions adapted to the heritage environment were required, with the help of which we connected the architecture of the past with the most modern building technology systems.
The project carried out within the area of Budapest Airport meant the rethinking and full-scale realization of the complex protection of a large-scale, critical infrastructure. The particularities of the nearly 1,500-hectare area, as well as the strict international regulations, made it necessary to develop an integrated technical concept that simultaneously provides a high level of protection, operational safety and future expandability.
The backbone of the system is an integrated perimeter protection solution 28 kilometers long, installed on the 3.1-meter-high fence, complemented by low-consumption, weather-resistant sensors and camera systems with a minimal false alarm rate. During the design, a key consideration was that the various detection and surveillance technologies operate as a unified system, while also being able to perform their tasks independently. The realized infrastructure not only meets the current security requirements, but, thanks to its modular structure, can also be flexibly expanded.
At the 4 domestic sites of the pharmaceutical manufacturer, which is present in 50 countries, headquartered in Hungary and under Hungarian management, we carried out a comprehensive and integrated access control modernization. A detailed system plan and device topology were prepared for the client, and during the project GDPR-compliant data handling and integration into the enterprise management system were also realized.
The challenge was primarily ensuring continuous operation, which we solved with temporary access control modules for the pharmaceutical company. During the implementation period, the tightened health protocols related to COVID were also in effect, so our colleagues had to carry out the construction with particular care.
At the Piliscsaba facility of the National Széchényi Library, a complex security technology and infrastructure development project integrating multiple systems was realized, the goal of which was the high-level protection of the collection forming part of the national cultural heritage and of the digital infrastructure serving it. During the project, we designed and realized systems that equally ensure the physical protection of the building, fire safety and the reliable operation of the IT networks.
One special element of the project is the oxygen-reduction fire prevention system, which prevents the outbreak of fire through continuous oxygen-level control, while human presence in the rooms is also safely possible. The special nature of the project lies in the fact that, in protecting a prominent cultural institution, every security and surveillance system operates on a unified platform, from perimeter protection to server room infrastructure. This approach ensures that the invaluable collection of Hungary's national library can be preserved for future generations alongside the highest level of technological protection.
The project carried out for the National Tax and Customs Administration involves the development and continuous improvement of a nationwide-scale, long-term security technology system. During the decades-long cooperation, our goal was to create an integrated surveillance infrastructure that brings the various protection systems into a unified framework, and is capable of ensuring transparent operation and central control at the national level.
The developed system is built up from several closely integrated subsystems: camera surveillance systems, alarm and fire detection solutions, access control systems, as well as central and remote monitoring platforms ensure the continuity of operation. During the more than 20-year project series, on the order of 1,500 cameras, 1,000 readers, 150 alarm centers, 100 access control centers and 25 surveillance systems were installed, together with the authorization management of tens of thousands of users. The developed infrastructure still provides a stable foundation for the nationwide operation of NAV today, while being able to flexibly adapt to the continuously changing security and regulatory environment.
On behalf of the US Department of Energy and the Sandia National Laboratories, within the framework of the Global Threat Reduction Initiative (GTRI) program, we participated in the development and realization of complex protection systems whose goal was to increase the security level of facilities using and storing radioactive materials in Hungary. The special nature of the project lay in the fact that unified, yet site-specific solutions had to be developed along internationally defined security expectations.
The task involved more than 35 domestic sites, where, in the interest of protecting the radiation sources, we designed and installed complex, closely integrated property protection and radiation protection systems. During the implementation, shielding solutions, detection equipment, special sensors and intrusion protection systems were developed, which together ensure the protection of the critical materials and the early detection of potential risks. The harmonization of the different regulatory environments played a prominent role during the project: the joint application of the International Atomic Energy Agency (IAEA) as well as the American and Hungarian regulations required a complex engineering approach that goes beyond the development of traditional security technology systems.
The goal of the project carried out at Accor Hotels' Hungarian facilities was to eliminate critical physical security deficiencies, as well as to comprehensively reorganize and modernize the IT infrastructure. During the multi-site task, particular emphasis was placed on surveying the existing systems and developing a unified, long-term sustainable operational structure.
The work involved 18 server rooms, where we performed a detailed physical security risk analysis, uncovering the vulnerabilities and improvement points of the infrastructure. As a result, the high-voltage networks were reorganized and refurbished, and modern surge protection solutions were developed, enabling more stable and secure operation. As part of the project, we also unified the structure of the IT networks, including network construction and modernization tasks. In addition to the technical interventions, we also paid special attention to documentation: unified, transparent documentation was prepared for each server room involved.
The Szépművészeti Múzeum is one of Budapest's most significant cultural institutions, whose building is under heritage protection. The complex reconstruction began with the architectural renovation of the Romanesque Hall, and then the modernization of the low-voltage infrastructure covering the entire building was carried out in several well-defined phases.
Within the framework of the project, H1 Systems Kft. performed comprehensive engineering, construction and system integration tasks. An outstanding element of the work was the introduction of the Fortecho artwork protection system, which H1 Systems Kft. recommended to the museum and, as its Hungarian representative, supplied and installed.
H1 Systems' building technology operations services ensure the continuous, regulated and compliance-controlled operation of life safety and security technology systems for critical infrastructures, government institutions and large enterprises – including, among others, the National Tax and Customs Administration, Richter Gedeon Zrt., the National Széchenyi Library and Yettel. Our service handles the systems as a unified infrastructure rather than as isolated elements, from fire detection and extinguishing systems to integrated surveillance, access control and camera systems.